ARD Remodeling Logo

BURBANK, CALIFORNIA

Home Remodeling Contractor in
Burbank, CA

With more than 10 years of experience, ARD Remodeling takes on kitchens, bathrooms, floors and whole-home updates for homeowners in Burbank, California. A free in-home estimate comes first: we walk the house, hear what you want to change and write the scope down before anything is scheduled. Burbank sorts permits into a quick track and a plan-check track, so we also work out early which of the two your project is likely to land on.

Call Us (424) 402-5114 →
Open-plan kitchen and living room with a walnut island, clay-beige cabinets, a terracotta sofa and a glass wall facing the hills
  • Free estimates
  • Burbank and nearby
  • Written scope
  • One crew to coordinate

Permits

Which permit track is your Burbank project on?

The city says building permits are needed for new construction, additions, remodels and alterations, and that this includes repair and maintenance of electrical, plumbing and mechanical systems. It then splits permits into two tiers, which is a useful way to size up a project before you call.

  • Tier 1, simple permits

    Repair and maintenance work that does not need plan check. The city lists items such as plumbing fixtures, water heaters, re-piping, electrical outlets and fixtures, and HVAC changeouts, and some single-family ones can be pulled online.

  • Tier 2, plan check or zoning

    Additions, alterations, new dwellings and accessory dwelling units. Drawings are reviewed first, and plans are uploaded through the city's ProjectDox system.

  • Check the exemptions list

    Burbank publishes a Work Exempt from Permits handout. Read it with the Building & Safety Division, since an exemption never excuses work that breaks the code.

The hours your crew may work

Weekday work is limited to 7 a.m. to 7 p.m. and Saturday work to 8 a.m. to 5 p.m. Sundays and the city's listed holidays are off limits, apart from a narrow exception for homeowners doing their own work with no contractors or employees. We build the schedule inside that window and tell you which loud days to expect.

  • Loud phases come first

    Demolition, cutting and hammering are front-loaded, so tell your neighbors before the first day.

  • Condos and associations

    A homeowners association may keep tighter hours than the city. Ask for its rules before you fix a date.

COMMON BURBANK PROJECTS

Projects homeowners ask about most

Starting points we hear often. Your list will usually mix a few of them.

  • Kitchen refresh or rebuild

    Cabinets, counters, backsplash and lighting, with plumbing and electrical moved only where the plan calls for it.

  • Bathroom overhaul

    A new shower, vanity and tile, with waterproofing planned before the finishes.

  • Living space update

    Floors, paint, lighting and built-ins that tie the main rooms together.

  • Doors and windows

    New openings or replacements that change the light and the flow of the house.

  • Converting space

    Additions go through plan check, and other changes of use are best raised with the city early, so we start from its requirements.

  • Finish and paint

    Final coats and trim, done after the dusty work is over.

Opening walls in an older Burbank home

Renovation and demolition work in the South Coast region falls under the air district's Rule 1403, which the city links from its permits page. It sets survey requirements, notification and work practices meant to stop asbestos from becoming airborne. Whether it applies depends on the materials in your house, so raise the age of the home as early as the first visit.

  • Tell us what you know

    Original plans, earlier permits, past repairs and photos of old finishes all help us ask the right questions.

  • Plumbing and wiring are checked too

    We look at the pipes and circuits that serve the rooms you are changing before the scope is final.

THE WHOLE HOUSE

Hallways and openings that connect the rooms

In many homes the spaces between rooms matter as much as the rooms themselves. We look at how you move through the house and plan doors, openings, trim and lighting so the remodeled rooms and the circulation between them feel like one design.

  • Doors and openingsWidths, arches and sightlines are reviewed with the layout.
  • Sconces and ceiling lightsLighting planned with the wiring, so walls are opened once.
  • Continuous flooringOne floor through the circulation spaces keeps rooms from feeling cut off.
Plastered hallway with two arched openings, brass wall sconces and a terracotta-striped runner on oak floors, with a dining room and living room beyond

Sequencing a multi-room plan

If you want a kitchen, a bath and new flooring, the order matters more than the budget split. Work that opens walls goes first, flooring and paint go last, and the permit track of each piece decides what can overlap.

  • Share the flooring

    One continuous floor through the hall, kitchen and living area looks calmer than several different ones.

  • Do electrical once

    New circuits, recessed lights and outlets are grouped so walls open only once.

PLAN-CHECK READY

What to gather before drawings are submitted

Projects on the plan-check track go smoother when these are in one folder.

  1. 1Your address and the approximate year the house was built
  2. 2Photos of every room being changed
  3. 3Any earlier plans, permits or repair records
  4. 4A rough list of what moves and what stays
  5. 5Product choices for fixtures, windows or appliances
  6. 6HOA or condo rules, if they apply

Do not worry if the folder is thin. We help with the missing pieces during the free estimate.

HOW IT WORKS

How a project in Burbank runs

  1. Step 1

    Walk-through at your home

    We see the rooms in person, measure and ask how you use the space day to day.

  2. Step 2

    Scope on paper

    Materials and finishes are chosen together, and you get the scope in writing.

  3. Step 3

    Which permit track

    We map the work to Burbank's simple-permit or plan-check route and note what drawings are needed.

  4. Step 4

    Work inside the city's hours

    Trades are sequenced within the permitted hours, and we walk the finished rooms with you at the end.

Good to know

Before you start in Burbank

Every point below comes from the source shown on its card, with the date we last checked it. Rules change, so confirm anything that affects your project directly with the source.

  • Official source

    Where the counter is

    Burbank's Building & Safety Division is in the Community Services Building, 150 North Third Street, first floor. The public counter is open Monday to Thursday 8:00 a.m. to 3:30 p.m. and Friday 8:00 a.m. to 3:00 p.m., closed 12 noon to 1:00 p.m. for lunch. Permits and plan check: (818) 238-5220, building@burbankca.gov.

  • Official source

    Two permit tiers

    The city divides permits into Tier 1 simple permits (repair and maintenance that need no plan check, many available over the counter and some for single-family homes online) and Tier 2 permits that require plan check or zoning approval, such as additions, alterations and accessory dwelling units.

  • Official source

    Hours for permitted construction

    Construction that needs a building permit may run Monday to Friday 7:00 a.m. to 7:00 p.m. and Saturday 8:00 a.m. to 5:00 p.m. in all zones. Sundays and city holidays are not permitted, except for homeowners doing their own work with no contractors or employees (8:00 a.m. to 5:00 p.m.).

  • Official source

    Current building code

    Burbank enforces the 2025 California Building Code with local amendments (Title 9 of the Burbank Municipal Code) for applications submitted on or after January 1, 2026.

  • Official source

    Asbestos rule for renovations

    The city's permits page points to South Coast AQMD Rule 1403, which sets survey requirements, notification and work practices to prevent asbestos emissions during building renovation and demolition.

FAQ

Remodeling questions in Burbank

Direct answers to what homeowners ask us most. If your question is not here, call or send a request.

Call Us (424) 402-5114 →
  • Burbank
  • Permits
  • Clear scope
Which Burbank neighborhoods do you cover?

Burbank is on our service-area list, along with Glendale and the surrounding Los Angeles area. Send your address with a request and we will confirm the visit.

Will my remodel go through plan check?

It depends on what changes. Repair-type work with no new layout often follows the city's simple-permit track, while additions, alterations and conversions go to plan check. The Building & Safety Division decides, and we map your plan to its tiers during the estimate.

Can contractors work on Saturdays in Burbank?

For permitted work, the city allows Saturdays from 8 a.m. to 5 p.m. and weekdays from 7 a.m. to 7 p.m. Sundays and listed city holidays are not allowed for contractors.

Does the age of my house change the plan?

It can. Older homes may contain materials that trigger the air district's asbestos rules, and older pipes and wiring often need attention once walls are open. Tell us the build year at the first visit.

How do I get a quote?

Request a free estimate on this page or call (424) 402-5114. A few photos and a short list of goals are enough for the first conversation.

Do I have to coordinate with an HOA?

If your home is in an association, its approval is separate from the city. Ask for its architectural and work-hour rules before booking a start date.

Service area

Also serving near Burbank

We work across Riverside, Orange, Los Angeles and San Bernardino counties. Call or send a request and we will confirm your address.

READY TO GET STARTED?

Planning a remodel in Burbank?

Tell us about your home and your plans. We will confirm the details and set up your free estimate.

Call Us (424) 402-5114 →